Case Study
Dallas ISD, Sunset High School
Project Snapshot
Customer / Site
Dallas ISD, Sunset High School
Industry
Education
Facility Type
High School Building
Location
Dallas, TX
Project Details
Greenheck dedicated outside air systems (DOAS) were the perfect solution for this renovation project. Greenheck Model RV units are available in 3 to 70 tons with options for DX cooling or chilled water cooling and natural gas, hot water, electric or air source heat pump heating.
MEP Engineer: B&H Engineers