Case Study
APN Addiction Recovery Center
Project Snapshot
Customer / Site
APN Addiction Recovery Center
Industry
Healthcare
Facility Type
Addiction Recovery Center
Location
Fort Worth, TX
Project Details
Greenheck Dedicated Outdoor Air Systems for high percentage and 100% outside air
- 2-inch double-wall cabinet with R13 injected foam insulation
- 500 to 18,000 cfm and up to 3 in. wg ESP
- Ideal for 100% outdoor air, variable air volume, and single zone applications
- Enthalpy wheel or enthalpy core options
- Direct drive, VFD driven, plenum supply/ exhaust fans
- Optional recirculation damper for 20-100% outside air and night setback operation
- Optional horizontal duct configurations for side return and supply
MEP Engineer: SW Associates