Projects
Pierce-Burch Water Treatment Plant Improvements Project
Pierce-Burch Water Treatment Plant Improvements Project
Bartos delivered product designed to provide a heavy duty and corrosion resistant heat source.
Dallas ISD, Sunset High School
Dallas ISD, Sunset High School
Provided units with options for DX cooling or chilled water cooling and natural gas, hot water, electric or air source heat pump heating.
Texas State University Engineering Building
Texas State University Engineering Building
The second floor of this building is an office that requires some privacy and quiet, unfortunately the lobby below was planned out as a open concept, student-filled area.
Alamo Heights ISD Barrier Wall
Alamo Heights ISD Barrier Wall
The school district wanted to mount a heavy-duty logo to the outside of the barrier wall to eliminate loud chiller noise near the stadium.
TCU School of Music
TCU School of Music
The rehearsal classrooms needed a variable amount of absorption and reflection. The result is a moveable panel set with a variety of core materials resulting in very specific conditions throughout the space as the instructors’ needs vary.
BGO Architects
BGO Architects
Bartos implemented 1-1/8” High Impact Panel acoustic treatment within the training/presentation room at BGO Architects.
Bell County Jail Facility
Bell County Jail Facility
Bartos supported the Bell County Jail Facility with complex exhaust and make-up air systems tailored to meet the demands of a secure, institutional environment.